Project Details
Project Specifications as currently planned:
- Geology : Depleted Natural Gas Reservoir
- Location : Northeastern Mississippi
- Interconnect : Tennessee Gas Pipeline
- In Service Date : June 2010
- Proposed Service:
- Firm storage service with an approximate 3 turn
ratcheted injection / withdrawal profile
- Maximum Storage Quantity (MSQ) : 20 billion cubic feet Bcf of
working gas
- Maximum Deliverability : 375 million cubic feet per day (MMcfd)
- Customer maximum daily withdrawal quantity (MDWQ) : MSQ divided by 53.333
- Maximum injections into field : 333 MMcfd
- Customer maximum daily injection quantity (MDIQ) : MSQ divided by 60.060
|